May[]
- 8: Initial construction on Moonbase Alpha is completed. Launch Pad 1 and the Space Exploration Division go into full operation. The above-ground structures support a crew of 100 while underground work continues.
- 17: On the far side of the moon, Nuclear Waste Disposal Area One is established as a part of the 'final' answer to Earth's problem of radioactive waste disposition.
June[]
- 2: The Eagle Transporter replaces the Falcon shuttle
July[]
- 11: The transport of nuclear waste from the holding site in Antarctica begins as Eagle spacecraft carry specially-designed containers to the disposal site on the moon.
Nov[]
- 14: The WSC approves the construction of an Eagle production facility to be located beneath Moonbase Alpha